Tai Ping 1958


Buildingyard: Deutsche Werft AG., Hamburg/ Germany        Built year: 1958           Yard no: 719

​Tonnage 58-70: GRT: 9369/ NET: 5851/ TDW: 10854 Tonnage 70-on: GRT: 11744/ NET: 8125/ TDW: 12597

​Dims 58-70: LOA: 159,71/ BR: 20,05/ DR: 8,621mtr                  Dims 70-on: LOA: 188,73/ BR: 20,05/ DR: 8,621mtr

​Machinery: 9-cyl B&W by B&W Maskin- og Skibsbyggeri  BHP: 11200 bhp           Speed: 18,00knots

Reeferspace: 941,81cbm/ Passengers: 12/ Teu's -70: 120 under deck

Photo: Chris Howell - www.shipspotting.com

02.04.1958: Launched                                                                                                                                                                                  27.06.1958: Delivered. Price: 24.770.638 NOK                                                                                                                                            30.07.1970: Arrived at Yokohama to be lengthened by Mitsubishi HI Ltd. The vessel got inserted a containersection midship                03.09.1970: Reconstruction completed                                                                                                                                                01.10.1977: Transferred to Arctic Shipping Singapore (Pte) Ltd. (Barber Ship Management), Singapore                                            07.06.1979: Sold to Compania Naviera Panagina SA. (Mediterranean Shipping Co. SA), Panama. Renamed GINA                            06.07.1984: Arrived at Chittagong Roads to be broken up by National Foundry & Eng Works (Pte) Ltd                                                    12.07.1984: Demolition commenced

              Photo: Chris Howell - www.shipspotting.com     Vessel shown after convertion