
Tai Ping 1958

Buildingyard: Deutsche Werft AG., Hamburg/ Germany Built year: 1958 Yard no: 719
Tonnage 58-70: GRT: 9369/ NET: 5851/ TDW: 10854 Tonnage 70-on: GRT: 11744/ NET: 8125/ TDW: 12597
Dims 58-70: LOA: 159,71/ BR: 20,05/ DR: 8,621mtr Dims 70-on: LOA: 188,73/ BR: 20,05/ DR: 8,621mtr
Machinery: 9-cyl B&W by B&W Maskin- og Skibsbyggeri BHP: 11200 bhp Speed: 18,00knots
Reeferspace: 941,81cbm/ Passengers: 12/ Teu's -70: 120 under deck
Photo: Chris Howell - www.shipspotting.com
02.04.1958: Launched 27.06.1958: Delivered. Price: 24.770.638 NOK 30.07.1970: Arrived at Yokohama to be lengthened by Mitsubishi HI Ltd. The vessel got inserted a containersection midship 03.09.1970: Reconstruction completed 01.10.1977: Transferred to Arctic Shipping Singapore (Pte) Ltd. (Barber Ship Management), Singapore 07.06.1979: Sold to Compania Naviera Panagina SA. (Mediterranean Shipping Co. SA), Panama. Renamed GINA 06.07.1984: Arrived at Chittagong Roads to be broken up by National Foundry & Eng Works (Pte) Ltd 12.07.1984: Demolition commenced
Photo: Chris Howell - www.shipspotting.com Vessel shown after convertion
